This functionality is only available for certain module packages. Info / Copyright

You are here: Comments and reports > Creating and sending a status report

Creating and sending a status report

If you want to inform a colleague in the manufacturing team or the manufacturing planner about the current status of the installation of a wiring project, you can create a status report of the project and send it as a message via e-mail. Apart from the status information of the routing connections, the status report also contains project and connection comments that have already been saved.

Preconditions

  • The e-mail server has been configured by your administrator.
  • You have started EPLAN Smart Wiring and opened or continued a project.

Procedure

  1. Select the menu item Status reportReport on the current status of the installation for all routing connections in the project.
  2. In the submenu select the [Save] option if you first want to save and later send the status report or select the [Send] option if you want to send the status report immediately.
  3. If you have decided to send, enter the e-mail address of the recipient in the next dialog.
  4. Confirm the entry.
  5. The e-mail is sent.

Note

The saved or sent status report is saved as a file of the type *.csv in the working directory or in the selected subdirectory.

We would like to learn from you. In order to improve the help system continuously, we are documenting your behavior with Google Analytics (Additional information & opt-out).