Templates allow projects to be created based on existing data. If you create projects using the project management or the project wizards, then you must always use a template. Templates for new projects are:
You can create your own templates from projects and store and manage them in any directory on any available drive.
Sample templates
After a standard EPLAN installation the ..\Templates\EPLAN and ..\Templates\<Company code> directories contain (e.g.) the following project templates and basic projects.
File name |
Meaning |
---|---|
IEC_tpl001.ept |
Project template: IEC identifier structure is pre-defined |
Num_tpl001.ept |
Project template: Sequential numbering is pre-defined |
GOST_tpl001.ept |
Project template: Suitable for creating projects conforming to the GOST standard |
IEC_bas001.zw9 |
Basic project: IEC identifier structure is pre-defined. Contains master data such as symbol libraries, forms, plot frame. |
Num_bas001.zw9 |
Basic project: Sequential numbering is pre-defined. Contains master data such as symbol libraries, forms, plot frame. |
GOST_bas001.zw9 |
Basic project: Suitable for creating projects conforming to the GOST standard. Contains master data such as symbol libraries, forms, plot frame. |
See also