Requirements for the export of the PLC connection points (input / output):
Requirements for the export of racks:
The Rack field is filled (PLC structure data tab in the property dialog of the PLC box).
Modules on a rack are characterized by the fact that the fields PLC card is placed on rack ID and Position (slot / module) are filled.
The Position (slot / module) field remains empty at a rack or a head station.
EPLAN assumes that devices on the same rack are connected by means of a "backplane". This is not configured separately.
Tips:
Use the "edit in table" function to achieve effective editing and checking of the PLC data. There are already predefined schemes for different use cases which you can adjust to your requirements if necessary.
Check before the export whether the required data exist in the project. The check runs of the message class 004 "PLC / Bus" are available to this purpose. For selected PLC manufacturers pre-defined schemes are available in the dialog Settings: Messages and checks.
Before carrying out the export, check whether conflicting PLC data exists at the different representation types of a bus port. You can use check run 007010 for this purpose. To only keep the data at the single-line representation, use the compressing of projects with the compressing setting "Remove project data > Bus data at non-single-line bus ports".