This functionality is only available for certain module packages. Info / Copyright

Synchronizing Master Data

The master data (e.g. a symbol library) is not referenced, but rather stored in the project, i.e. copied into the project. The storage of the master data being used thus occurs within the Project. Depending on the project settings specified under Options > Settings > Projects > "Project name" > Management > General, Options > Settings > Projects > "Project name" > Management > Symbol libraries, and Options > Settings > Projects > "Project name" > Reports > Display / output you can, if necessary, manually start the synchronization of project master data with the system-specific data.

Note:

The master data comparison is not case-sensitive with regard to file names. The file name ABC.XYZ is identical to abc.xyz.

Synchronize individual master data objects

Preconditions:

  1. Utilities > Master data > Synchronize current project
  2. In the Synchronize master data - <project name> dialog click the column heading in the tables in order to sort the data alphanumerically in either ascending or descending order by column. For example, if you click the column Type, all entries will be sorted and displayed according to the Master data type.
  3. In the Project master data list select the master data objects that you would like to transfer to the system master data. (Multiple selection is possible.)
  4. Click .
  5. In the System master data list select the master data objects that you would like to transfer to the project master data. (Multiple selection is possible.)
  6. Click .
  7. Click [Close].

Note:

In both actions, EPLAN informs you in a message window as to how many project / system master data files were updated and, if the project / system master data were identical, in which a message is also generated.

Globally synchronize master data

Preconditions:

  1. Utilities > Master data > Synchronize current project
  2. In the Synchronize master data - <project name> dialog select [Update] > Project in order to globally replace all outdated project master data with newer system master data.
  3. Select [Update] > System to globally replace all outdated system master data with newer project master data.
  4. Click [Close].

Notes: