During the project verification compare the settings and properties of the comparison project and incoming project to each other. Similarly, check runs are carried specifically for the incoming project.
Preconditions:
- You have selected a project management database.
- In project management, you have loaded directories and projects.
- The loaded directory contains the returned incoming project.
- You have access to the original project that you want to use as the comparison project.
- Select the following commands: File > Project management.
- In the project management mark the project that contains the advanced project status.
- Select [Extras] > Verify project.
- Click (New) next to the Select comparison project field.
- In the subsequent dialog select the original project which is the comparison project and click [Open].
- To perform a project-specific settings comparison during the project verification, activate the check box Compare settings and select an existing comparison scheme from the Scheme drop-down list below.
You can Create a settings comparison scheme via [...]. - To perform a property comparison during the project verification, activate the check box Compare properties and select an existing comparison scheme from the Scheme drop-down list below.
You can Create a property comparison scheme via [...]. - To perform project checks during the project verification, activate the Perform project checks check box and select an existing check run scheme from the Scheme drop-down list below.
You can create a new Error check scheme for project verification via [...]. - To compare the project structures of the two projects to each other, activate the check box Compare project structures.
- To stop the project comparison when the first difference is found, activate the check box Stop comparison when first difference is found.
- Click [OK].
The projects are compared to each other and the specified error checkings are performed.
In the Project verification: Results dialog, EPLAN automatically displays the overall result of the project verification.
Detailed results are listed in the message management (command path: Tab Tools > Command group Verify > Messages).
See also
Comparison Project and Incoming Project