Cause
With this check run you can determine whether placed functions exist in the detailed planning (in the P&I diagram or in the schematic) for segments (PCT loops or planning objects) created in the pre-planning navigator. In the concrete case there is no function in the detailed planning for the segment existing in the pre-planning.
Solution
Possibility 1
- Locate the corresponding segment in the pre-planning navigator using the Synchronize selection function offered by the popup menu in the Message management dialog.
The respective segment is marked in the pre-planning navigator. - Place the segment on a page of the type "P&I diagram" or on a schematic page.
Possibility 2
Exclude the segments that do not have to be placed from the check. Define corresponding filters to this purpose.